Washington State University Buildings and Landscapes

Meat Sciences Lab

Date of Original Construction: 1970–1971

Original Architect: Earl Muir (who took over for Philip Keene; Earl is unlikely the designer of the building, but it is the best information currently available)

Original Construction Cost: $856,000

Use/Function: Processing eggs, poultry, and red meats
 


This page has paths:

Contents of this path: