Washington State University Buildings and Landscapes

Ensminger Pavilion

Date of Original Construction: 1933

Original Architect: Research Required

Original Construction Cost: Research Required

Date of Remodel (altered to be used as an event space [$270,000]): 2001

Use/Function: Livestock judging; Event space
 


This page has paths:

Contents of this path: