Martin Stadium
Original Architect: Naramore, Bain, Brady and Johanson (NBBJ) did the North and South stands
Original Construction Cost: $1,490,000 for the North stands
Date of Remodel (reconstruction of south grandstand): 1972
Date of Remodel (reconstruction of north grandstand): 1975
Date of Remodel (removal of track, lowering of field, and addition of seats): 1979
Date of Other Remodels: 1990, 2000
Date of Remodel (main entrance, widening concourse on east and north sides, ticketing building, replacement of concessions and restrooms [$26 million], which was designed by Hellmuth, Obata and Kassabaum and the Sports Facilities Group with Madsen Mitchell Evenson and Conrad): 2006–2008
Date of Remodel (press box, premium seating, and luxury suites, designed by ALSC Architects with AECOM [$54 million]): 2011
Date of Remodel (Football Operations Building [$61 million], designed by Adkison, Leigh, Sims, and Cuppage (ALSC) Architects): 2012–2014
Use/Function: Football