Washington State University Buildings and Landscapes

CUB

Date of Original Construction: 1950–1952

Original Architect: John W. Maloney

Original Construction Cost: Research Required

Date of Remodel (lower glass was added, as well as many other changes): 1957

Date of Remodel (major addition and remodel, including the theater): 1967‑1968

Date of Remodel (the building was completely remodeled on the interior [$86 million], which was designed by Pfeiffer Partners and Integrus Architecture): 2006–2008

Use/Function: Student center; Dining; Bowling Alley
 


This page has paths:

Contents of this path: