Washington State University Buildings and Landscapes

Abelson Hall

Date of Original Construction: 1934–1935

Original Architect: Rigg and Vantyne

Original Construction Cost: $270,000

Date of Remodel (rooftop addition): 1984

Date of Remodel (the Abelson Greenhouse was added on the top of the building): 1989

Use/Function: School of Biological Sciences; Greenhouse; Connors Museum
 


This page has paths:

Contents of this path: