Washington State University Buildings and Landscapes

Bohler Gym

Date of Original Construction: 1925–1928

Original Architect: Stanley Smith

Original Construction Cost: $450,000

Date of Remodel (a major addition [$11 million] was added to the north side of the building, which was designed by Sasaki Associates): 1995–1996

Use/Function: Men's Physical Education; Department of Intercollegiate Athletics
 


This page has paths: